
Design and Construction of a 10 m-long flume at Graf Hall (Oregon State University)
Project: Design and Construction Management of a 10m-long flume (October 2011-March 2012)
Description: Design and construction management of a 10 m long semi-circular (D = 18'') recirculatory flume. This facility is located in Graf Hall (OSU) and is intended to be used for academic purposes but it can be used for small-scale research. The maximum flow discharge is 10 liters per second.
PI: Arturo Leon
Funding Agency: Oregon State University (Start-up funds)

|