




|
|
Florida International University
-
Project Title:
Analysis of Energy, Environment and Life Cycle Cost Reduction
Potential of Ground Source Heat Pumps (GSHP) in Hot and Humid
Climate
Role: Co-PI (PI: Yong Tao)
Institution: Florida International
UniversityFunding Agency:
Department of Energy
Time Period: January, 2010 – December, 2010
-
Project Title:
A Feasibility Study on Energy Performance and Environmental Impact
of InnoVida Homes
Role: Co-PI (PI: Yong Tao)
Institution: Florida International
UniversityFunding Agency:
InnoVida, U.S., LLC
Time Period: October, 2009 – December, 2009
-
Project Title:
The Development of Improved Information Management Processes for FDOT Dispute Review Board System
Role: PI
Institution: Florida International
UniversityFunding Agency: the Florida Department of
Transportation (FDOT)
Time Period: August, 2008 – March, 2010
-
Project Title:
Developing a Realistic Prototyping Road User Cost Tool for FDOT
Role: PI
Institution: Florida International
UniversityFunding Agency: the Florida Department of
Transportation (FDOT)
Time Period: January, 2007 – June, 2008
-
Project Title:
Future
House USA
Role: Co-PI (PI: Dr. Yong Tao)
Institution: Florida International
UniversityFunding Agency: the Alternative
Energy Living Foundation (AEL)
Time Period: August, 2006 – December, 2007
-
Project Title: Impact
of Seismic Requirements on Electrical Installations
Role: PI
Institution: Florida International
UniversityFunding Agency: the
Electrical Contracting Foundation (ECF)
Time Period: January – December, 2006
-
Project Title: An Integrated Information
System for Electrical Contractors
Role: PI
Institution: Florida International University
Funding Agency: the Electrical Contracting
Foundation (ECF) Time Period: January – December, 2006
-
Project Title: Development of a Strategic
Model for Improvement of Construction Project Management Education,
Research and Practice in Pakistan Role: Co-PI (PI: Dr. Syed M. Ahmed ( USA ) and Dr. Sarosh H. Lodi (
Pakistan )) Institution: Florida International University
Founding Agency: the United States Agency for
International Development (USAID) and the Higher Education Commission (HEC),
Government of Pakistan Time Period: January 1, 2006– December 31, 2008
Georgia Institute of
Technology
-
Project Title: A Study on the Energy
Efficiency of the Sam Nunn Atlanta Federal Center via Computerized
Simulation, Role: PI
Institution: Georgia Institute of Technology
Funding Agency: GSA (General Service
Administration)
Time Period:
May, 2002 – December, 2002.
|